Hydunai Engineering & Construction Co. Ltd/
Sewerage Department, Singapore Public Utilities Board
PROJECT
VALUE
S$1,850,000.00
DATE
19
March 1996 - 30 December 1997
PROJECT
SCOPE
Supply, installation and Commission of 6 numbers of
Digester Mixer for 6 numbers Digester Tanks including
spares parts and training.
The
equipment includes supporting brackets, draw off
pipes, electrical panels and Instrumentation.
UNIQUENESS
OF
PROJECT
The
6 numbers of digester Tanks with the new compact and
cover design is shaped like an egg shell with a holding
capacity of 6400m are the first built in Singapore.
The Thickened Sludge coming from
the holding tanks to the 6 numbers of digester will
be measured by Flow meters. The digester is then
mixed by draft tube with DSL. Mix-1 mixer.